Packer is set by circulating a ball through packer down to ball seat in the Hydro Trip Sub. After packer is set, a continued increase in pressure is applied to shear the shear screws in the shear ring, allowing the ball seat collet to move down into the collet relief area and allowing the ball to pass down the Hydro Trip Sub through the tubing, leaving a “full open” Sub with no restrictions to production.